Thursday, June 23, 2016

Seabrook Job - Tile Installation

Following the plumbing work, faucet replacements and shower nozzle centered on the new shower area, the floor tile was installed in the bathroom and closet. 
Below are some photos of the tile installation in progress.


Installing Tile in the Closet and the completion of the Closet
Below are examples of the tile cuts needed to surround the Jacuzzi and the door to the bathroom:
Below are the tile cuts required for the shower. Also show the cement shower floor border that was custom made for the new tile shower.

And finally .....  Some photos of the finished tile floor after installation. 
Left: Bathroom        Right: Closet
Bathroom Toilet Area
Closet

No comments :

Post a Comment