Sunday, June 19, 2016

Seabrook Job - Shower Removal

After all the tile removal and closet carpet removal, the next step in the bathroom remodel was to remove the existing shower. The existing shower will be replaced with a custom tile shower. 
The existing shower removal is shown below.

View of top of shower
Removal of doors
Floor needed to be removal
The barrier was full of silicon
Shower walls
The new floor will need a new drain cover for the tile shower.

No comments :

Post a Comment