Saturday, May 14, 2016

April Seabrook Job Before

It has been a while since we have posted some thrifty family posts. We are gonna get started on the backlog of things that have been done over the last few months. First one we will start with is a job that was completed in Seabrook. This job included removing the old tile flooring in bathroom and carpet in closet as well as the old shower. Then install a new tile floor in both bathroom and closet and tile shower with a seat. Also, retile around the jacuzzi and change the faucets and move the shower faucets to the new location. So plumbing too. Here are some before pics of the closet and bathroom floor, shower and jacuzzi.
Before Shower 
Before Jacuzzi 
Before Walk-in Closet 
Before bathroom floor 
Before bathroom floor 
Before bathroom floor